Skip to product information
1 of 1

Hella

HELLA PRO 8DD 355 123-481 Brake Disc Internally Vented, Coated, without wheel hub, without wheel studs

HELLA PRO 8DD 355 123-481 Brake Disc Internally Vented, Coated, without wheel hub, without wheel studs

Regular price £34.00 Inc. VAT
Regular price Sale price £34.00 Inc. VAT
9th Anniversary Badge

Price Match

Price Match Guarantee

If you find a lower price at an eligible US retailer website, we will match it.

Questions about this part?

Our technical advisors can confirm fitment for your vehicle. Contact us with your vehicle details.

UNLOCK BIGGER DISCOUNTS WITH ML PLATINUM
Sign Up

Sign up now for FREE

View full details

This is the HELLA PRO 8DD 355 123-481 Brake Disc Internally Vented, Coated, without wheel hub, without wheel studs.

General Details:

Diameter (mm) 280
Thickness (mm) 22
Disc Type Internally Vented
No. Of Holes

Please utilize our product recommender to double confirm compatability. Feel free to contact us at info@mlperformance.co.uk should you require any assistance!


To ensure the part(s) you have ordered fits your vehicle, we run a compatibility check prior to dispatch. We can do this either using your registration number(UK) or the last 7 digits of your VIN. Simply enter your car details prior to checkout.

8DD355123-481

  • Price Match Guarantee

    We are committed to giving you the best price. if you find a lower price on the same item at an eligible US retailer website, we will match it.

  • Fast US Delivery

    For in-stock item, get guaranteed fast US delivery. Same day dispatch available on in-stock items if your order is placed before 1pm ET.

  • Worldwide Shipping

    We ship worldwide via DHL International, simply enter your full address at checkout to see the shipping option(s) and quote(s). Same day dispatch available if your order is placed before 1pm ET on all in stock items!